中文 | EN | Sitemap | RSS | XML
精密冲压件,五金冲压模具
Current location : Home >> News >> Industry News

ContactContact

Shenzhen Jinjue Industrial Co., Ltd.

Contact: Mr. Liu

Telephone: 139 2746 0496

Fixed line: 0755-23224860

Mailbox: info@ jinjueshiye.com

Address: No. 6, Tianyang 2nd Road, Datianyang Industrial Zone, Songgang Street, Baoan District, Shenzhen, Guangdong Province

Website: www.jinjueshiye.com


What are the operating procedures for hardware parts processing?

2020-07-25 09:03:22
Times

1. Before entering the work position, all employees need to check whether their clothing meets the requirements of the work. It is not allowed to wear slippers, high heels, and clothing that affects work safety. If they have long hair, they need to wear a helmet when working. You need to maintain the correct qualifications and have enough energy to cope with the work. If you find that you are unwell, you need to leave the job immediately and report to the leader. During the operation, the mind is concentrated, chatting is strictly prohibited, mutual cooperation is required, and the operator is not allowed to be irritable and tired Operate in the state of the accident, while a safety accident occurs;

   2. Before the machine works, it is necessary to check whether the moving part is filled with lubricating oil, then start and check whether the clutch and brake are normal, and run the machine dry for one to three minutes. It is strictly forbidden to operate when the machine is faulty;



  

3. When changing the mold, you should turn off the power first. If it is a punch, you should wait until the moving part of the punch stops to start installing and debugging the mold. After installation and debugging, move the flywheel by hand to test punch twice, and check the upper and lower molds. Whether it is symmetrical and reasonable, whether the screws are fastened, and whether the blank holder is in a reasonable position;

  4. It is necessary to wait until all other personnel have left the mechanical working area and remove the sundries on the workbench before the power can be turned on and the machine can be started;

5. After the machine is started, one person transports materials and performs mechanical operations. Others are not allowed to press buttons or foot pedal switches, and it is strictly forbidden to put their hands in the mechanical working area or touch the moving parts of the machine with their hands to perform mechanical operations. It is forbidden to reach into the working area of the slider, and it is strictly forbidden to pick and place parts by hand. When picking and placing the workpiece in the die, you must use tools that meet the requirements. If you find abnormal sound or malfunction of the machine, you should immediately turn off the power Switch and check;

   Six. Turn off the power when you are off work and arrange the finished products, side materials and sundries on the job to ensure the cleanliness and safety of the working environment;

The above are the relevant steps of hardware processing. The operator must consciously follow it. There is no need to operate in violation of the regulations. If there is a failure, they should cooperate with the maintenance personnel to perform maintenance. All the consequences caused by the violation of the operating procedures shall be borne by the parties concerned;


Recently Viewed: